it_depends_man ,

I helped design large-ish electrical grids. 30-100k cables

Without the actual calculation bits, unfortunately.

Not very interesting. Bad software. Management didn't really care about the problem. I was there so the problem was "managed" from their point of view.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • [email protected]
  • kbinchat
  • All magazines